The horizontal spiral drilling rig produced by our company is mainly used for Trenchless pipe jacking construction of roads and buildings, with split structure.The main engine is separated from the power station, and the main engine is far away from the construction tunnel, with low noise and reasonable structure.The main engine can be equipped with diesel engine power and motor power, and the main hydraulic parts are of international famous brands, so the construction speed is fast.With high safety and stable performance, it is an ideal choice for Trenchless pipe roof and pipe curtain construction.

Product Description

Key Features

Achieve Precision & Zero Settlement with Simultaneous Drilling and Pipe Jacking

Horizontal directional spiral drilling rig can achieve synchronous drilling and pipe jacking, with high construction accuracy and no settlement in the construction area.

Robust Frame, Powerful Drilling, Precise Guidance: Core Structure of the HDD Rig

The host is frame type, and the power head and feeding mechanism are installed on the rack guide rail. The power head adopts an integral enclosed gearbox with high torque; The feeding mechanism adopts hydraulic cylinder propulsion and retraction, which is simple and reliable; Drilling tools are divided into directional drill rods and spiral drill rods; The guiding instrument is LED laser guided, with high accuracy and fast feedback speed.

Specifications

  • Main engine power

The main engine is equipped with motor power:

Motor power: 90KW Y280M-4 Speed: 1450 R/min

The motor is connected with two American SauerDanfoss hydraulic pumps through a coupling, and a load sensing control system is adopted.The maximum rotary flow is 140L/min and the maximum push-pull flow is 85L/min

  • Power head:

A high-speed hydraulic motor with a speed reduce is adopted for that rotation of the pow head,The motor is an axial piston variable motor manufactured by Rexroth in Germany or Sam in Italy, equipped with a 5-speed manual transmission and a reverse gear function.Five gears and ten speeds are steplessly adjustable.

Gear 1 Rated torque 6000Nm Speed 0 — 90r/min 0 — 135r/min Speed stepless adjustable

Gear 2 Rated torque 9500Nm Speed 0 — 60r/min 0 — 90r/min Speed infinitely adjustable

Gear 3 Rated torque 15000Nm Speed 0 — 38r/min 0 — 56r/min Speed stepless adjustable

Gear 4 Rated torque 27000Nm Speed 0 — 20r/min 0 — 30r/min Speed infinitely adjustable

Gear 5 Rated torque 45000Nm Speed 0 — 12.r/min 0 — 18r/min Speed stepless adjustable

The front end of the main shaft of the power head is a hexagonal + API NC 40 thread combination structure, the main shaft faucet is 2 inches, and the pressure resistance is 8 MPa.

  • Rig push-pull:

The stroke of the power head is 6m, the stroke of two cylinders for push-pull of the power head is 3000MM, the maximum thrust of the drilling rig is 240t, and the maximum pulling force is 120t.

The maximum pulling force of the drilling rig is 120 tons, and the maximum speed is 2.4 m/min, which is stepless and adjustable.

The maximum thrust of the rig is 240 tons, and the maximum speed is 1.2 m/min, which is stepless and adjustable.

If there is no travel:

The maximum pulling force of the rig is 120 tons, the maximum speed is 6 m/min, and the speed is stepless and adjustable.

The maximum thrust of the drilling rig is 240 tons and the maximum speed is 3 m/min. The speed is stepless and adjustable.

Rack and pinion structure is adopted for quick retraction of drilling rig, and the maximum speed can reach: 36 m/min

  • Rig mast structure.

The mast of the drilling rig adopts a spliced structure with a total length of about 9 meters, which is anchored once.

The main engine can be equipped with a truck-mounted crane with a rated lifting capacity of 2 tons.

Spiral auger is the way of dumping, with the maximum construction diameter of 650 MM and the maximum construction distance of 240 meters.

Application

Send Inquiry

Your needs

Helping us to understand your needs will help us to ensure we're getting you the best advice.

Your details

By letting us know your name and company it helps us to assign the most relevant department.

Providing us with your email and phone number means our sales team can reach you effectively.
We require country to make sure we direct your enquiry to the best place.

Contact our Team

Message Sent!

Thank you. We'll get back to you soon.