


XY-4T / XY-42T / XY-44T Tower Crane Integrated Spindle Drilling Rig
Model:
Angle range:
Type:
Product Description
Key Features

The rig is in higher rotational speed and rational range of rotational speed; large torque in low speed.
The operation levers are concentrated, so the operations are reliable and convenient.The drill is suitable in the mountain area because of light weight for easy transport and convenient disassembly (to be disassembled into nine parts).

Fitted with meters, the circumstances can be controlled easily in hole.
The tower adopts a four sided mast assembly structure, which is installed on the ground and lifted by hydraulic pressure. When the main engine moves back and the vertical shaft leaves the hole, the overhead pulley group can move forward

With low center of gravity, the rig is reliable and stable in high speed drilling.
The transmission is separately driven for drill rig and mud pump; it is easier for the location arrangement with less space occupying.
Specifications
| 1.XY-4T Basic parameters | |||
| Drill depth | 800m(Φ42mm drill pipe) | ||
| 560m(Φ50mm drill pipe) | |||
| 800m(BQ drill pipe) | |||
| 560m(NQ drill pipe) | |||
| Adjusting the angle of the drilling tower | 45~90° | ||
| Drilling tower height | 10m | ||
| Tower base area | 4×4㎡ | ||
| Number of crown wheels | 5个(Double wheel) | ||
| Rated load of overhead crane | 80kN | ||
| Activity Workbench Load | 80kg | ||
| External dimensions of drilling rig(Length×Width×Height) | 4000×4000×10460mm | ||
| drill weight (Excluding power devices) | 4310kg | ||
| 2.Gyrator(When equipped with a 30kW, 1470r/min power machine) | |||
| Vertical shaft speed | Forward to low speed | 97;178;255;370r/min | |
| Forward to High Speed | 297;548;781;1136r/min | ||
| Reverse low-speed | 79r/min | ||
| Reverse High Speed | 242r/min | ||
| Vertical axis travel | 600mm | ||
| Maximum lifting force of vertical axis | 80kN | ||
| feeding capacity | 60kN | ||
| Maximum turning torque of vertical shaft | 2610N·m | ||
| Vertical shaft through-hole diameter | 68mm | ||
| 3.winch(When equipped with a 30kW, 1470r/min power machine) | |||
| Maximum lifting capacity of a single rope | 30kN | ||
| Boost speed (third layer) | 0.80;1.48;2.12;3.08m/s | ||
| Wire rope diameter | 16mm | ||
| Drum capacity rope capacity | 90m | ||
| 4.Vehicle moving device | |||
| Moving the oil cylinder stroke | 460mm | ||
| The maximum distance between the front end of the drilling rig and the hole after moving the vehicle |
310mm | ||
| 5.hydraulic system | |||
| System set working pressure | 8MPa | ||
| 20ml/r | |||
| 6.Drilling rig power | |||
| model | Y2-200L-4 motor | ZH4100G43 Diesel engine | R4105G53 Diesel engine |
| power | 30kW | 31kW | 42kW |
| speed | 1470r/min | 1500r/min | 1500r/min |
| 1.XY-42T Basic parameters | |||||
| Drill depth | 880m(Φ42mm drill pipe) | ||||
| 490m(Φ60mm drill pipe) | |||||
| 880m(BQ drill pipe) | |||||
| 640m(NQ drill pipe) | |||||
| Adjusting the angle of the drilling tower | 45~90° | ||||
| Drilling tower height | 10m | ||||
| Tower base area | 4×4㎡ | ||||
| Number of crown wheels | 5个(Double wheel) | ||||
| Rated load of overhead crane | 80kN | ||||
| Activity Workbench Load | 80kg | ||||
| External dimensions of drilling rig(Length×Width×Height) | 4000×4000×10460mm | ||||
| drill weight (Excluding power equipment) | 4430kg | ||||
| 2.Gyrator(When equipped with a 30kW, 1470r/min power machine) | |||||
| Vertical shaft speed | Forward to low speed | 81;150;214;311r/min | |||
| Forward to High Speed | 249;460;656;954r/min | ||||
| Reverse low-speed | 66r/min | ||||
| Reverse High Speed | 203r/min | ||||
| Vertical axis travel | 600mm | ||||
| Maximum lifting force of vertical axis | 80kN | ||||
| feeding capacity | 60kN | ||||
| Maximum turning torque of vertical shaft | 3220N·m | ||||
| Vertical shaft through-hole diameter | 92mm | ||||
| 3.winch(When equipped with a 30kW, 1470r/min power machine) | |||||
| Maximum lifting capacity of a single rope | 30kN | ||||
| Boost speed (third layer) | 0.80;1.48;2.12;3.08m/s | ||||
| Wire rope diameter | 16mm | ||||
| Drum capacity rope capacity | 90m | ||||
| 4.Vehicle moving device | |||||
| Moving the oil cylinder stroke | 460mm | ||||
| The maximum distance between the front end of the drilling rig and the hole after moving the vehicle | 278mm | ||||
| 5.hydraulic system | |||||
| System set working pressure | 8MPa | ||||
| Gear oil pump displacement | 20ml/r | ||||
| 6.Drilling rig power | |||||
| model | Y2-200L-4 motor | ZH4100G43 Diesel engine | R4105G53 Diesel engine | ||
| power | 30kW | 31kW | 42kW | ||
| speed | 1470r/min | 1500r/min | 1500r/min | ||
| 1.XY-44T Basic parameters | ||
| Drill depth | 1100m(Φ42mm drill pipe) | |
| 600m(Φ60mm drill pipe) | ||
| 1100m(BQ Rope drill rod) | ||
| 880m(NQ Rope drill rod) | ||
| Adjusting the angle of the drilling tower | 45~90° | |
| Drilling tower height | 10m | |
| Tower base area | 4×4㎡ | |
| Number of crown wheels | 5个(Double wheel) | |
| Rated load of overhead crane | 100kN | |
| Activity Workbench Load | 80kg | |
| External dimensions of drilling rig(Length×Width×Height) | 4000×4000×10530mm | |
| drill weight (Excluding power equipment) | 4940kg | |
| 2.Gyrator(When equipped with a 30kW, 1470r/min power machine) | ||
| Vertical shaft speed | Forward to low speed | 82;151;215;313r/min |
| Forward to High Speed | 251;463;660;961r/min | |
| Reverse low-speed | 67r/min | |
| Reverse High Speed | 204r/min | |
| Vertical axis travel | 600mm | |
| Maximum lifting force of vertical axis | 126kN | |
| feeding capacity | 94kN | |
| Maximum turning torque of vertical shaft | 3860N·m | |
| Vertical shaft through-hole diameter | 92mm | |
| 3.winch(When equipped with a 37kW, 1480r/min power machine) | ||
| Maximum lifting capacity of a single rope | 45kN | |
| Boost speed (third layer) | 0.69;1.28;1.82;2.65m/s | |
| Wire rope diameter | 17.5、18.5mm | |
| Drum capacity rope capacity | 110、90m | |
| 4.Vehicle moving device | ||
| Moving the oil cylinder stroke | 460mm | |
| The maximum distance between the front end of the drilling rig and the hole after moving the vehicle |
278mm | |
| 5.hydraulic system | ||
| System set working pressure | 8MPa | |
| Gear oil pump displacement | 20ml/r | |
| 6.Drilling rig power | ||
| model | Y2-225S-4 motor | R4105G53 Diesel engine |
| power | 37kW | 42kW |
| speed | 1480r/min | 1500r/min |
Application
It can be used in mineral exploration to explore for mineral resources such as gold, copper and diamonds, engineering geological exploration, geotechnical investigation to investigate the subsurface geology and soil conditions of a site, environmental sampling, etc. core drilling rigs are essential tools for a wide range of industries that require precise, deep drilling capabilities.
